Please use this identifier to cite or link to this item:
http://hdl.handle.net/20.500.12725/12081
Title: | Time reduction for flyover highway projects - a method study. |
Authors: | Mistry, Diptanshu |
Guide: | Trivedi, Jyoti |
Issue Date: | 2010 |
URI: | http://hdl.handle.net/20.500.12725/12081 |
Appears in Collections: | Thesis (Faculty of Technology_UG) |
Files in This Item:
File | Description | Size | Format | |
---|---|---|---|---|
B TH-0443.pdf Restricted Access | 23.31 MB | Adobe PDF | Request a copy | |
B TH-0443 Summary.pdf | 10.66 kB | Adobe PDF | Preview PDF |
Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.