Please use this identifier to cite or link to this item: http://hdl.handle.net/20.500.12725/9640
Title: Reduction of through put time in electrotherm ltd. by using value stream mapping in production shop floor-panel shop.
Authors: Thacker, Jekin
Guide: Arora, Nilesh
Iyengar, Shreekant
Issue Date: 2012
URI: http://hdl.handle.net/20.500.12725/9640
Appears in Collections:Thesis (Faculty of Management_PG)

Files in This Item:
File Description SizeFormat 
MTM TH-0022.pdf
  Restricted Access
47.77 MBAdobe PDF Request a copy
MTM TH-0022 Summary.pdf329.91 kBAdobe PDF Preview PDF


Items in DSpace are protected by copyright, with all rights reserved, unless otherwise indicated.